General
Requests for an Integrated Design Team to be assigned to a project
Requests for updates to master specifications – turned over to the Spec owner for review and approval
Submit Maximo work order requests for Engineering Support are done through the Facilities Work Request site
Code Compliance & Inspection
Request for IAHJ and Inspection review of installations
Reviews for completed designs to determine if it meets current code requirements
Building Automation & Controls
Requests for info on current zone/condition alarm including set points and info on recent excursions. Additionally, can be used to request inclusion on the alarm/alert distribution list
Electrical
Updates to BlueBeam project library of single line drawings
Requests for updates to the formal Panel Schedule spreadsheets ensuring accurate and updated information
Structural
Requests for anchorage designs/reviews specific for ALS-U
Utility Locating
Request for permits for ground/floor/wall penetrations require a permit to ensure there are no utility lines or other obstructions that would impact the work
Document Controls
Requests for new drawing numbers to be issued to place hold for future drawing submittals
At project close-out Record Drawings need to be submitted for review and upload to the Meridian Database
Request updates or corrections to existing drawings
Access to the Meridian engineering document system and information on how to use